Aller au contenu
Accès anticipé · Fournisseurs fondateurs dans le monde entier
All resources
Blog12 June 2026

How to run a warehouse fit-out procurement that actually compares

Bundled quotes hide the trade-offs that decide a fit-out. Here is how to structure an RFQ so racking, mezzanines and handling equipment can be compared line by line — and awarded to the best supplier per line.

By LayTech

A warehouse fit-out is rarely one purchase. It is racking, a mezzanine, conveyors, dock equipment and a fleet of trucks — often from different specialists. The most common procurement mistake is asking each integrator for one bundled number. A single price tells you nothing about where a supplier is strong.

Specify the project once, line by line

Start by capturing the building and the operation: clear height, floor loading, aisle strategy, throughput. Then list each line you need as its own requirement — 1,200 pallet positions of adjustable racking, a 600 m² mezzanine, two reach trucks. A defensible spec is a list, not a paragraph.

Quote line by line

When every supplier responds per line, three things happen:

  • You can see the real price of each component, not a blended figure.
  • A racking specialist who is weak on MHE can still win the racking lines.
  • Abnormally low lines stand out instead of hiding inside a bundle.

Score on MEAT, not price alone

Most regulated buyers already use MEAT — the Most Economically Advantageous Tender. Weight price against lead time, warranty and technical fit, and score every line on the same rubric. The award becomes a number you can defend, not a gut call.

Split the award

The payoff of line-item quoting is split-award: give each line to the supplier who scored best on it. You almost never get the best racking and the best handling equipment from the same vendor. Splitting the award is how a structured RFQ beats a bundled one — usually on both price and delivery.

A good fit-out RFQ is auditable end to end: every line, every score, every award has a reason attached.

That is the whole point of running procurement this way — and it is exactly what the LayTech RFQ builder is designed to produce.

procurementrackingrfq

Ready to put this into practice?